Market and Policy (Malaysia)
- NOVA: Net Offset Virtual Aggregation under NEM3.0; allows offset across accounts.
- SELCO: Self-Consumption; on-site use without export credit.
- SARE: Supply Agreement for Renewable Energy; tripartite contract framework.
- TNB: Tenaga Nasional Berhad; utility and grid operator.
- ICPT: Imbalance Cost Pass-Through; surcharge/rebate applied to consumption.
- KWTBB: RE Fund surcharge applied to energy charge.
- Tariff Category: TNB codes like B (domestic), C1–C3 (commercial), D–F (industrial).
- SMP: System Marginal Price; reference for export pricing (used as
SMP_export.rate in configs).
Technical
- kWp: DC array peak power rating.
- kWh: Energy unit.
- CT Rating: Current transformer/connection limit constraining system/export.
- Maximum Demand (MD): Peak power demand during billing period.
- Performance Ratio (PR): Actual output vs theoretical output.
- Peak Fraction: Assumed share of consumption during peak hours (TOU).
- Daytime Ratio: Share of daily consumption occurring during daytime.
- Decision Variables: System size (kWp), optional BESS capacity (kWh).
- Constraint: Feasibility rule (e.g., CT limit, roof/budget bounds).
Finance
- NPV: Net Present Value.
- IRR: Internal Rate of Return.
- ROI: Return on Investment.
- CapEx/Opex: Capital and operating expenditures.
- Amortization Schedule: Loan repayment breakdown over time.